期刊文献+

不同设计阶段水库淹没处理及移民安置规划深度要求 被引量:2

The Depth Demand on Reservoir Submergence Treatment and Immigration Setting Plan in Different Design Stage
在线阅读 下载PDF
导出
摘要 阐述了编制移民安置规划的重要性和进行移民安置规划设计不同阶段的深度要求。随着水利水电建设事业的不断发展,人们已逐渐认识到系统的移民安置规划对工程建设和社会稳定的重要性,而国务院发布的第471号令更是对这一重要性的肯定,作为工程设计人员要重视移民安置规划设计,使完成的规划设计能够切实可行。 This article sets forth the importance on working out the immigration setting plan and the different depth demands according to the different design stages. With the continuous growth of the hydroelectric construction project, the importance has been realized gradually on the system immigration setting plan. And in the No.471 document issued by the State Council this importance is affirmed. Being a design person, he must pay attention to the immigration setting plan to make the plan design feasible.
作者 艾莉莉
出处 《山西水利科技》 2008年第4期25-26,32,共3页 Shanxi Hydrotechnics
关键词 水库 移民 条例 规划设计 reservoir immigration regulation planning and design
  • 相关文献

同被引文献20

  • 1风笑天.论问卷调查的特点和适用范围[J].华中师范大学学报(人文社会科学版),1989,28(6):24-28. 被引量:7
  • 2郭立.中国水库移民主要安置模式[J].瞭望,2006(13):29-29. 被引量:3
  • 3TD/T1012-2000.土地开发整理项目规划设计规范[S].[S].,..
  • 4SL196-97.水文调查规范[S].[S].,..
  • 5SL442-2009,水利水电工程建设征地移民实物调查规范[s].
  • 6国土资源部土地整理中心.土地复垦方案编制实务[M].北京:中国大地出版社,2011:6-7.
  • 7区域水文地质工程地质环境地质综合勘查规范GB/T14158-93[S].国家技术监督局,1993.
  • 8张晓强,袁俊,陈余才.如何开展城镇土地权属调查[J].2011(2):133-134.
  • 9刘长安,论土地权属调查与地籍测量[J].2003(1):30-33.
  • 10T/DT1007-2003,耕地后备资源调查与评价技术规程[S].

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部