摘要
本文采用Duncan-Chang模型和新型接触面单元编制了二维有限元程序DSAF,用于圆形地下连续墙开挖过程的分析模拟,算例分析结果与工程实测值较为接近。
This paper introduces 2D finite element program DSAF prepared by using Duncan-Chang rnodel and a new contact surface unit. This new program can analyze and simulate the process of the excavation of the circular di-aphragm wall. The analyzed results obtained by the calculations fairly approach the measured values achieved from engineering practice.
关键词
D-C模型
有限元法
开挖
地下连续墙
模拟
Duncan-Chang model
circular diaphragm wall
contact surface unit
finite element method
excavation