摘要
结合南水北调中线工程北京西四环引水暗涵工程二衬混凝土施工中的技术要求,就轨道台车模板施工技术在暗涵二衬混凝土施工中的应用进行了总结和分析。
Connecting with the technical requirements of second lined concrete construction of the buried derivation culvert in the Fourth Loop of Beijing of the middle route of South-to-North Water Diversion Project, this paper sums up and analyzes the application of trace trolley formwork in the buffed derivation culvert of the middle route of South-to-North Water Diversion Project.
出处
《科技情报开发与经济》
2008年第27期202-204,共3页
Sci-Tech Information Development & Economy
关键词
轨道台车
南水北调工程
引水暗涵
二衬混凝土
trace trolley
South-to-North Water Diversion Project
buffed derivation culvert
second lined concrete