摘要
针对高温高藻期给水厂排泥水的特点,研究了排泥水处理负荷、加药条件、搅拌条件、回流污泥控制及排泥控制等因素对排泥水处理系统运行的影响情况,提出了排泥水处理系统的优化建议。
In this study, based on the properties of the sludge effluent during high temperature and algae-bloom period in waterworks, the capacity of the treatment, the conditions for dose additions, mixing conditions, the control of the sludge return and the sludge discharge were studied and their impacts on the performance of the treatment system were discussed. Suggestions were proposed to optimize the treatment system of sludge effluent.
出处
《给水排水》
CSCD
北大核心
2008年第10期15-18,共4页
Water & Wastewater Engineering
基金
天津市科技支撑计划重点项目"水厂排泥水高效处理技术集成与应用示范"(07ZCKFSH01300)
关键词
高藻期
排泥水
处理
优化
Algae-bloom period
Sludge effluent
Treatment
Optimization