期刊文献+

紧贴运营地铁车站深基坑施工侧向变形相关性探析 被引量:1

Pertinence of Lateral Deformation of Deep Excavation Closely by Metro Station in Operation
原文传递
导出
摘要 以上海地铁8号线人民广场站深基坑施工为例,通过一系列实测数据的统计分析,对紧贴运营地铁车站进行深基坑工程建设过程中新、老车站结构变形规律,以及变形控制进行了现场监测和理论计算的分析研究。 Take the deep excavation of People Square Station of Shanghai Rail Transit line 8 as a study case.By statistical analysis,a series of actual data were collected.Depending on these actual data,theoretical calculation and analysis study were made.And structural deformation regularity and control measures were come up with for both the new station and the existing station during the construction of deep excavation closely by the metro station in operation.
作者 刁伟轶
出处 《地下工程与隧道》 2008年第3期19-21,30,共4页 Underground Engineering and Tunnels
  • 相关文献

参考文献2

共引文献131

同被引文献13

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部