期刊文献+

浅谈建筑安装工程与土建工程的协调配合 被引量:4

Introduction of the Coordination Between Installation Works and Civil Engineering
在线阅读 下载PDF
导出
摘要 安装工程与土建工程的施工配合贯穿施工整个过程,在施工中如何解决好两者之间的协调配合,对保证整个工程的顺利进行至关重要.笔者结合工程实际,从施工准备、预留预埋、施工安装、装饰装修等4个施工阶段,概述了各个阶段安装工程与土建工程在施工过程中应注意协调配合的有关事项,实践证明如果配合得法,将取得事半功倍的效果. The coordination between the installation work and the civil engineering was throughout the whole process, it was important to coordinate between them for the progress of the whole project. Based on the practical project, the present work summarized the relevant matters with regard to the coordination between installation work and civil engineering in construction preparatory stage, the embedding stage, the installation stage, and the decoration stage. Consequently, it would be a multiplier effect with the proper coordination.
出处 《青岛理工大学学报》 CAS 2008年第4期129-132,共4页 Journal of Qingdao University of Technology
关键词 安装工程 土建工程 协调配合 installation works civil engineering coordination
  • 相关文献

参考文献6

二级参考文献5

共引文献268

同被引文献16

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部