摘要
从有限元分析及动强度测试两方面对秦皇岛第三期煤码头O型翻车故障进行了研究,找到了翻车机钢结构的故障根源,证明了原始设计的失误,并提出了完整的改造设计方案。
The O-type dumping car at thethird phase coal dock in Qinhuangdao was de-signed by Dravo Wellman Company of U- S. A .Many failures are occured by the steel structure,which influenced the normal production of dockboard from working- This paper studies the fail-ure of dumping car based on finite element calcu-lation and dynamic strength testing and finds thesource of its steel structure failure then provesthe mistakes of original design, finally gives thetotal improvement design plans.
出处
《中国机械工程》
EI
CAS
CSCD
北大核心
1997年第3期28-31,共4页
China Mechanical Engineering