基于无追索融资方法的发电企业投资风险控制 被引量:1

Risk control of generation company enterprise based on without-recourse financing method
在线阅读 下载PDF
导出
摘要 "十一五"期间,我国预计投产电源2.6亿kW,总的建设投资超过1万亿元人民币。如果只凭发电企业自身拥有的资金,很难实现电源建设目标,有必要研究资金筹集渠道以及控制融资风险的方法。以美国霍普威尔火力发电站融资项目为背景,分析发电企业从自建电厂到购买发电权、从公司融资到项目融资等各方面的转变,为我国发电行业融资及其风险控制提供启示。 In the "eleven fifth" period, China has prepared to put 2.6 hundred million kilowatt generation into production, the total building investment will more than 1 thousand billion Yuan.Facing the huge investment, the generation enterprisecompany can hardly achieve the building target only by themselves. So it is necessary to study the financing way and control the financing risk. The paper analysis analyzed the America Hopewell generation company's financing item, including the change from building the new generation power plant by themselves to supporting others to build the new power plant, from the company financing to project financing and so on. Hope the study can give some apocalypse to China's power generation companies about their financing and the risk control.
出处 《中国电力》 CSCD 北大核心 2008年第1期45-48,共4页 Electric Power
基金 国家自然科学基金资助项目(70373017,70571023)
关键词 电力市场 发电企业 项目融资 风险分析 无追索融资 power market power generation companyenterprise project financing risk analysis without-recourse financing
  • 相关文献

参考文献6

二级参考文献6

共引文献25

同被引文献12

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部