摘要
文章以华电国际邹县电厂四期工程为例,详细介绍了超超临界1000MW机组给水控制系统的特点及控制方案,为提高控制系统的可靠性,采取了减少中间接口对保护回路进行优化的措施,并提出了需要进一步对系统优化的问题。
The paper, with the fourth phase project of Huadian International Zouxian Power Plant as example,detailed the features and control scheme of feedwater control system of ultra-supercritical pressure 1 000 MW generating units.In order to improve the reliability of control system,the following measures were adopted:to decrease the intermediate interfaces, to optimize the protection loop, and to put forward the problem of needing to further optimize the system.
出处
《电力设备》
2008年第1期16-18,共3页
Electrical Equipment
关键词
超超临界
给水系统
控制优化
ultra-supercritical pressure
generating unit
feedwater system
optimization of control