分析了拆除工程的主要事故原因,结合工程概况,通过对本工程结构工程拆除不利因素进行的介绍,提出了结构拆除总体方案,并对实施过程进行了阐述,实践结果表明,结构拆除工程顺利完成,同时加快了施工进度,可为类似拆除工程提供参考经验。
It analyses the main accidents reasons of back out projects. And combined with the projects general situation, through the introduction on the adverse factors of structure projects back out of the project, it puts forward the whole program of structure back out, and represents the carrying out progress. The practice effect illustrates that it accelerates the construction progress of the trouble free finish of structure back out project, and can supply experience to the similar back out project.
出处
《山西建筑》
2008年第3期175-175,264,共2页
Shanxi Architecture
关键词
结构拆除工程
安全控制
拆除工艺