摘要
文章详细介绍了江西南昌发电厂2×125MW机组脱硫工程系统及工艺,它采用湍流式循环流化床干法脱硫工艺,工艺简单,投资较低,对老机组脱硫改造有借鉴作用,有利于减少二氧化硫的排放和改善环境。
his paper introduce the desulphurization project system and technology of the 2 × 125MW unit of Jiangxi Province Nanchang power plant. The system adopted turbulence CFB dry desulphurization technology, which has simple craftwork and low investment, and it can provides good reference to the old power units. This project is propitious to reducing the release of SO2 and improving the environment.
出处
《江西能源》
2007年第4期16-18,共3页
Jiangxi Energy