摘要
通过介绍神华新疆公司大洪沟煤矿+535水平+573 m分层西翼B3-6煤层综放工作面的安装方法,为类似条件工作面的安装提供可借鉴的技术经验。
By introducing the installation method of + 535 horizon + 573m layered west wing B3 - 6 coal seam fully mechanized and caving coal face of Dahonggou Coal Mine of Shenhua Xinjiang Energy Co., Ltd., the referential experience of technology was provided for the working face with similar conditions.
出处
《煤炭技术》
CAS
2007年第11期60-62,共3页
Coal Technology
关键词
综放工作面
支架安装
支护方式
fully mechanized and caving coal face
support mounting
support way