期刊文献+

航天器自主规划系统分析与设计 被引量:9

Analysis and design of autonomous control system for spacecraft
在线阅读 下载PDF
导出
摘要 首先提出了一种包括规划与调度、执行以及执行监控与故障诊断的航天器自主控制系统。在此基础上,重点针对航天器分系统众多、组成复杂、知识表示困难的特点,提出了基于分层结构的航天器自主规划与调度系统的设计方法。该方法能够有效地表示和管理航天器的相关知识,并能根据给定的高级任务目标,结合自身状态进行推理,搜索出合理的指令序列,当发生故障或其他紧急情况时,能够进行重规划。 An autonomous spacecraft control system including planning and scheduling, command execution, execution surveillance, and fault diagnosis was presented. On the basis of the system and consideration of many sub-systems, complicated configuration, and difficult knowledge expression in spacecraft, a design method of autonomous planning and scheduling system based on hierarchical structure was given. This method can effectively express and manage knowledge about the spacecraft propose high level goals, as well as search for reasonable command sequence according to the state of the spacecraft. When some fault or emergency occurs, this method can conduct re-planning and rescheduling.
出处 《吉林大学学报(工学版)》 EI CAS CSCD 北大核心 2007年第6期1471-1475,共5页 Journal of Jilin University:Engineering and Technology Edition
基金 '863'国家高技术研究发展计划项目(2003AA735080)
关键词 飞行器控制导航技术 自主控制 航天器 体系结构 规划与调度 control and navigation technology of aerocraft autonomous spacecraft architecture planning and scheduling
  • 相关文献

参考文献7

  • 1Pandurang Nayaky P, Douglas E Bernard , Gregory Doraisz, et al. Validating the DS1 remote agent experiment[C] // In Proceedings of the Fifth International Symposium on Artificial Intelligence, Robotics and Automation for Space (i-SAIRAS), The Netherlands: 1999.
  • 2Chien S, Sherwood R, Tran D. The EO-1 autonomous science agent[C]//Proc of the 2004 Conference on Autonomous Agents and Multi-agent Systems, 2004 :420-427.
  • 3Estlin T, Rabideau G, Darrem Mutz, et al. Using continuous planning techniques to coordinate multiple rovers[C]//IJCAI99 Workshop on Scheduling and Planning, Stockholm, 1999,1-7.
  • 4Barnsley M J, Settle J J, Cutter M A. The PROBA/CHRIS mission: A low-cost smallsat for hyperspectral multiangle observations of the earth surface and atmosphere[J]. IEEE Transactions on Geoscience and Remote Sensing, 2004, 42 :1512-1520.
  • 5代树武,孙辉先.卫星的智能规划与调度[J].控制与决策,2003,18(2):203-206. 被引量:18
  • 6徐瑞,徐晓飞,崔平远.基于时间约束网络的动态规划调度算法[J].计算机集成制造系统-CIMS,2004,10(2):188-194. 被引量:11
  • 7Barney Pell, Douglas E Bernard,Steve A Chien. An autonomous spacecraft agent prototype[J]. Autono- mous Robots,1998, 5(1): 29-52.

二级参考文献13

  • 1段凡丁.关于最短路径的SPFA快速算法[J].西南交通大学学报,1994,29(2):207-212. 被引量:58
  • 2Nils J Nilsson.Artificial Intelligence: A New Synthesis[M].北京:机械工业出版社,1999..
  • 3ALLEN J F.Maintaining knowledge about temporal intervals[J].Communications of the ACM,1983,26(11):832-843.
  • 4ALLEN J.Planning as temporal reasoning[A].KR'91:Principles of Knowledge Representation and Reasoning[C].Cambridge,MA,USA:Morgan Kaufmann Publishers,1991.3-14.
  • 5BADALONI S,BERATI M.Hybrid temporal reasoning for planning and scheduling[A].Proceedings of 3rd Workshop on Temporal Representation and Reasoning (TIME'96)[C].Los Alamitos,CA:IEEE,1996.39-44.
  • 6VRBSKY S V,TOMIC S.Satisfying temporal consistency constraints of real-time databases[J].The Journal of Systems and Software,1999,45(1):45-60.
  • 7MUSCETTOLA N,NAYAK P P,PELL B,WILLIAMS B.Remote agent:to boldly go where no AI system has gone before[J].Artificial Intelligence,1998,103(1-2):5-47.
  • 8DECHTER R,MEIRI I,PEARL J.Temporal constraint network[J].Artificial Intelligence,1991,49(1-3):61-95.
  • 9SCHWALB E,VILA L.Temporal constraints:a survey[J].Constraints:An International Journal,1998,3(2-3):129-149.
  • 10SCHWALB E,DECHTER R.Processing disjunctions in temporal constraint networks[J].Artificial Intelligence,1997,93(1-2):29-61.

共引文献25

同被引文献59

  • 1林墨.深空测控通信技术发展趋势分析[J].飞行器测控学报,2005,24(3):6-9. 被引量:9
  • 2张正强,谭跃进.自主航天器的规划系统建模研究[J].计算机工程与应用,2006,42(32):197-199. 被引量:4
  • 3姚敏,赵敏.基于模糊神经网络的小卫星任务自主调度设计[J].宇航学报,2007,28(2):385-388. 被引量:10
  • 4Russell S,Norvig P.人工智能--一种现代方法[M].2版.北京:人民邮电出版社,2004.
  • 5ILOG Inc.Mountain View,CA.ILOG CPLEX10.1 user's manual[Z].2006.
  • 6Vossen T,Ball M.Applying integer programming to AI planning[J].Knowledge Engineering Review,2001,16:85-100.
  • 7Vossen T,Ball M.On the usc of integer programming model in AI planning[C]//Proceedings of the 18th International Joint Conferenee on Artificial Intelligence(IJCAI'99),1999:304-309.
  • 8van den Briel M.Reviving integer programming approaches for AI planning:A branch-and-cut framework[C]//Proceedings of the International Conference on Automated Planning and Scheduling (ICAPS2005),California,USA,2005:310-319.
  • 9Kautz H,Selman B,Hoffmann J.SatPlan:Planning as satisfiability[C]//Proceedings of the 5th International Planning Competition Conference,2006:45-46.
  • 10Backstrom C,Nebel B.Complexity results for SAS+planning[J].Computational Intelligence,1995,11(4):625-655.

引证文献9

二级引证文献52

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部