摘要
介绍了针对凝结水精处理设备周期制水量小的问题所进行的各种试验及试验结果,提出了对应措施。
This article presents various tests conducted which aimed to solve the water underproduction problem in periodic mode of condensate polishing system as well as the test results. It also put forward corresponding countermeasures.
出处
《华北电力技术》
CAS
2007年第10期9-10,共2页
North China Electric Power
关键词
精处理
周期
制水量
试验
控制
fine treatment
cycle
water output
test
control