摘要
论述了利用垃圾土填筑路基(试验段)的施工方案,介绍了虚铺厚度试验的统计结果及试验成果在施工中的应用效果,并且应用于太原市滨河西路北延段路基施工中,节约了大量建设投资。
Discusses the construction scheme of utilizing refuse soil filling roadbed (test sechion) ,introduces the statistics result of void paving thickness test and application effects of test section achievement in the construction, also it applies in the construction of roadbed north prolonging section in Binhe west road,Taiyuan, saves of a lot of investment.
出处
《山西焦煤科技》
2007年第9期21-23,共3页
Shanxi Coking Coal Science & Technology
关键词
垃圾土
填筑
路基
试验
应用
Refuse soil
Filling
Roadbed
Test
Application