糯扎渡新型预应力闸墩工作性态研究 被引量:5

Study on State of Working Performance of a New-type Pre-stressed Gate Pier for Construction of Nuozhadu Hydropower Project
在线阅读 下载PDF
导出
摘要 糯扎渡水电站溢洪道最大泄量31318 m3/s,为国内排名第一、世界第四;泄洪水头182 m,泄洪功率55860 MW,均为世界第一位。闸室控制段共设8个15 m×20 m(宽×高)表孔,每孔均设检修门和弧形工作闸门,中墩厚4.5 m,最大弧门推力达38216 kN,设计采用预应力混凝土结构。文章采用ANSYS有限元软件对新型预应力闸门运行的各种工况进行了分析研究,得出了相应的结构变形和应力成果。 The maximum discharge of the spillway of the Nuozhadu hydropower project is 31,318m^3/s, ranking first in the country and fourth in the world; Its flood discharging head and flood discharging energy are 182m and 55,860MW respectively, both ranking first in the world. The gate chamber control section is provided with eight(8) 15m×20m(W×H) overflow oudets in total, each of them is equipped with a bulkhead gate and a radial working gate. The gate pier is 4.5m thick and the maximum radial gate thrust is 38,216kN. The pier is of a pre - stressed concrete structure in design. This paper has made an analysis and study of various working conditions for gate operation using ANSYS finite element software, thus obtaining relative structural deformation and stress results.
出处 《云南水力发电》 2007年第4期33-38,共6页 Yunnan Water Power
关键词 预应力闸墩 有限元 结构分析 成果 pre- stressed gate pier finite element structural analysis result
  • 相关文献

参考文献5

  • 1Bathe KJ.Finite Element Procedures in Engineering Analysis[M].England Cliffs:Prentice-Hall,1982.
  • 2中国水利水电科学研究院结构材料研究所.天生桥一级水电站弧形门预应力闸墩的试验研究[R].
  • 3张天刚.MARC软件在溢洪道预应力闸墩结构分析中的运用[J].云南水力发电,2004,20(5):60-63. 被引量:1
  • 4DL/T5176-2003[S].水电工程预应力锚固设计规范.
  • 5DL/T5057-1996,水工混凝土结构设计设计规范[S].

同被引文献17

引证文献5

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部