摘要 对焦炭塔堵焦阀接管部位分别进行了在塔顶馏出管线所作用的管端推力(矩)以及塔体轴、径向温差和接管与塔体连接区域温差载荷下的应力计算。结果表明,管端推力(矩)对该部位的应力起着重要作用。并将新塔堵焦阀部位的整体接管补强与旧塔的补强圈补强进行了应力对比,证明新塔接管焊缝处应力数值减小。 Calculations of pipe end thrust (moment)applied by tower top effluent pipe,the loads caused by temperature difference between axial and radial of tower shell,and between the connecting pipe and adjacent portion of tower shell are carried out. The calculating results indicate that the pipe end thrust(moment)play an importance role in the stress on that portion. By comparision with integral reinfocement stress value of plugging coke valve of new tower to the reinforcement pad stress value of old tower,the stress value at connecting pipe weld of new tower is reduced.
出处 《石油化工设备技术》 CAS 1997年第1期1-5,共5页 Petrochemical Equipment Technology
关键词 焦炭塔 堵焦阀接管 应力计算 炼油设备 Coke drum,Connecting pipe of plugging coke,Valve pipe end thsust(moment),Opening reinforcement,Stress calculation
  • 相关文献

参考文献2

二级参考文献2

共引文献2

同被引文献34

引证文献3

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部