摘要
根据兴隆庄煤矿地质采矿条件,结合松散含水层赋存特征,分析了四采区4303综放工作面第四系松散含水层出水的原因,探讨了防治三含水的技术途径和留设防砂煤柱的合理尺寸。
Based on the geological and mining conditions and occurrence characteristics of loose aquifer of Xinglongzhuang Colliery, water bursting cause of 4303 full-mechanized caving mining face under loose aquifer was analyzed, the prevention measures of the 3rd aquifer and reasonable dimension of coal pillar for sand proof were discussed in this paper.
出处
《煤矿开采》
2007年第2期21-23,共3页
Coal Mining Technology
关键词
松散含水层
出水
综放
防砂煤柱
loose aquifer
water bursting
full-mechanized caving mining
coal pillar for sand proof