摘要
三峡水利枢纽双线五级船闸完建工程施工中,首次成功地将液压同步提升技术运用在水利水电工程建设施工中,其技术处于国内先进水平,为水利水电工程建设施工积累了宝贵的经验。
During the construction of the two way-five stage shiplock of the Three Gorges multi-propose project, hydraulic sychronic hoisting technigue is first applied successfully in the construction of hydropower project. The technique is acknowlcdged as advanced level domesticly. Some valuable experience has been accumulated for construction of projects of hydropower and water conservancy.
出处
《液压气动与密封》
2007年第2期4-5,共2页
Hydraulics Pneumatics & Seals
关键词
液压同步提升
永久船闸
hydraulic sychcronic hoisting
permanent shiplock