期刊文献+

露天矿“废石场”铜金属溶浸提取的试验研究 被引量:7

Test of Copper Leaching from “Waste Dump” of a Surface Mine
在线阅读 下载PDF
导出
摘要 应用稀硫酸溶液,对露天矿废石场4个矿样进行铜金属溶浸提取室内实验,得出不同实验条件下浸出率、浸出液金属含量和浸出周期等因素之间的关系.结果表明:采用浓度ρ(H2SO4)为5-10 g/L的稀硫酸作为浸取液浸出铜的浓度和浸取母液的pH值等指标能满足下一步回收铜的技术要求;用原样直接浸取,其浸取率约在30%-60%之间,其中B-1号样的回收率较高,B-2号样较低,如对原样进行适当破碎,则可使浸出率进一步提高;从渗透性来看,B-1号样最好,B-2次之,B-3,B-4渗透性较差;对于渗透性差的矿石类型,建议废石场的堆高为4-6 m,此时浸出周期估计为30-150 d,其中B-1号矿样的矿石类型浸取周期较短,其余几种矿石类型浸取周期将会长一些. Leaching copper of four samples from a surface mine's waste dumps were tested using sulfuric acid in laboratory. The relations of leach cycle, extraction efficiency of copper and pregnant concentration of copper, etc. were determined under various experimental conditions. The results show that p(H2 SO4 ) of 5 - 10 g/L is suitable as the lixiviant of copper for the case. The pregnant solution of the copper concentration and the pH value can meet the requirements of fluid recovery of copper. The recovery rate of copper from the primary ore samples can reach 30%-60%. The recovery rate of B-1 is the highest, and that of B-2 is the lowest. If the ore samples are further broken before leaching, the rate will be increased. The seepage behavior of B-1 is the best, that of B-2 is middle, and those of B-3 and B-4 are poor. The height of heap of stockpiles for waste dump is suggested 4-6 m. In this case, the leach cycle is estimated 30-150 d, and that of B-1 is the shortest.
出处 《中国矿业大学学报》 EI CAS CSCD 北大核心 2007年第2期159-165,共7页 Journal of China University of Mining & Technology
基金 国家杰出青年科学基金项目(50325415)
关键词 露天矿废石场 铜金属回收 溶浸实验 可行性研究 waste dump of surface mine copper recovery leaching test feasibility study
  • 相关文献

参考文献15

  • 1CELIK H.Extraction of gold and silver from a Turkish gold ore through thiourea leaching[J].Minerals and Metallurgical Processing,2004,21(3):144-148.
  • 2AKCIL A.A preliminary research on acid pressure leaching of pyritic copper ore in Kure Copper Mine,Turkey[J].Minerals Engineering,2002,15(12):1193-1197.
  • 3MULLIGAN C N,KAMALI M.Bioleaching of copper and other metals from low-grade oxidized mining ores by Aspergillus niger[J].Journal of Chemical Technology and Biotechnology,2003,78(5):497-503.
  • 4李壮阔,桂斌旺,段希祥.德兴铜矿堆浸厂的生产实践及技术研究[J].矿冶工程,2002,22(1):46-48. 被引量:26
  • 5吕萍.低品位高含泥氧化铜矿制粒堆浸新工艺的研究[J].矿业研究与开发,2001,21(2):32-34. 被引量:17
  • 6UHRIE J L,KOONS G J.Evaluation of deeply ripping truck-dumped copper leach stockpiles[J].Mining Engineering,2001,53(12):54-56.
  • 7吉兆宁,余斌,刘坚,陈何.寿王坟铜矿矿石室内可浸性试验研究[J].矿冶,2001,10(4):6-10. 被引量:5
  • 8ROBERT W B.Solution Mining:Leaching and Fluid Recovery of Materials[M].USA:SME Press,1998.
  • 9ULRICH B,ANDRADE H,GARDNER T.Lessons learnt from heap leaching operations in South America-An update[J].Journal of the South African Institute of Mining and Metallurgy,2003,103(1):23-28.
  • 10DIXON S.Definition of economic optimum for the leaching of high acid-consuming copper ores[J].Minerals and Metallurgical Processing,2004,21(4):198-201.

二级参考文献7

共引文献45

同被引文献98

引证文献7

二级引证文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部