期刊文献+

基于时间延迟维修理论检查模型的比较研究 被引量:8

The Delay-time-based Inspection Models and Their Comparison
原文传递
导出
摘要 主要解决设备故障停机时间较长情况下如何修正基本检查模型并优化维修间隔期的决策问题。首先阐述了时间延迟概念及其原理,建立了基于时间延迟维修理论的单元件系统基本检查模型,该基本检查模型的建立是基于设备故障停机时间相对检查周期较短的情况,提出了缺陷在故障停机期间继续发生的假定条件,该假定条件并不适合故障停机时间较长的情况,为此提出了只有在设备运行期间才会发生缺陷的假定条件并修正了基本检查模型,根据修正后的检查模型估算出检查周期内故障次数期望值。通过案例比较基本检查模型与修正模型之间的差异,计算结果表明,修正后的模型在检查周期的确定、故障停机时间期望值的计算方面具有更高的精度。 This paper is mainly concerned on problems of revising the basic inspection model and optimizing the preventive maintenance interval of equipment in the case of longer failure downtime. Firstly, the concept of delay time and its maintenance theory are introduced, therefore, a basic inspection model for single-unit system is established using delay time maintenance theory. In modeling this inspection model, it is based on the case that failure downtime is short compared to inspection cycle. Therefore, assuming that defects continue to arise during failure downtime. Obviously, this assumption is not suit for the case that failure downtime is not sufficiently small. So this paper assumes that defects only occurred in operation time of equipment. Then the basic inspection model is revised, and the expected number of failures over inspection cycle is given by the revised inspection model. Finally, a case study is also proposed to highlight the differences. The revised downtime model is a more sensitive model in determining the actual downtime and optimal inspection interval.
作者 吕文元 郑睿
出处 《管理科学》 CSSCI 2007年第1期18-21,共4页 Journal of Management Science
基金 国家自然科学基金(70301002) 上海市重点学科建设项目(T0502)
关键词 时间延迟 维修 检查模型 检查周期 delay time maintenance inspection model inspection cycle
  • 相关文献

参考文献1

二级参考文献2

  • 1Oday Kumar[瑞典].维修技术和管理[J].中国设备管理,1997,(7):35-36.
  • 2Oday Kumar,中国设备管理,1997年,7期,35页

共引文献5

同被引文献48

  • 1顾煜炯,董玉亮,杨昆.基于模糊评判和RCM分析的发电设备状态综合评价[J].中国电机工程学报,2004,24(6):189-194. 被引量:68
  • 2奚立峰,周晓军,李杰.有限区间内设备顺序预防性维护策略研究[J].计算机集成制造系统,2005,11(10):1465-1468. 被引量:20
  • 3郑国禹,陈亮,谭佐富.军械装备维修技术研究进展[J].四川兵工学报,2007,28(2):18-20. 被引量:4
  • 4王超,徐政,潘武略,邵伟.中国用户停电损失调查方法[J].电网技术,2007,31(11):54-58. 被引量:26
  • 5Oday Kumar[瑞典].维修技术和管理[J].中国设备管理,1997,(7):35-36.
  • 6Christer A H, Waller W M. An operational research approach to planned maintenance modeling PM for vehicle fleet[J]. Journal of the Operational Research Society, 1984 (35) :584 - 967.
  • 7CHRISTER A H, LEE C. Refining the delay-time based PM inspection model with non-negligible system downtime estimates of the expected number of failures[ J]. International Journal of Production Economics, 2000,67(1) : 77 - 285.
  • 8CHRISTER A H, LEE C. Refining the delay-time based PM inspection model with non-negligible system downtime estimates of the expected number of failures [ J ]. International Journal of Production Economics, 2000, 67 ( 1 ) : 77285.
  • 9CHRISTER A H, WALLER W M. Reducing production downtime using delay time analysis[J]. Journal of the Operational Research Society, 1984, 35 (6) : 499 - 512.
  • 10Christer, A. H., Lee, C. Refining the Delay-time-based PM inspection Model with Non-negligible System Downtime Estimates of the Expected Number of Failures [J]. Int. J. Production Economics 2000, (67).

引证文献8

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部