电力系统恢复的主从递阶决策模型及其优化算法 被引量:17

Leader-Follower Hierarchical Decision Model and Optimal Method for Power System Restoration
在线阅读 下载PDF
导出
摘要 引入主从递阶决策概念,建立了一种适合于大面积停电后分布式恢复的主从递阶决策模型。该模型包括主从递阶恢复决策结构和基于承诺与约定的主从递阶决策模型。通过自下而上的可行性检验与自上而下的目标优化,限制问题的求解规模,避免了对大规模系统直接求解的困难。针对主从递阶决策问题的优化求解,提出基于回溯算法的优化方法。山东电网的仿真结果表明,该方法充分考虑了电力系统分层递阶调度的特点,能满足大规模电力系统大面积停电后分层分区恢复协调调度决策的要求。 From the viewpoint of STACKELBERG decision problems, a leader-follower hierarchical decision model is proposed for distributed restoration after blackout. This model includes a leader-follower hierarchical restoration decision-making structure and coordination based on commitments and conventions. The computation burden is reduced by the feasible examination from bottom to top and the goal optimization from top to bottom. An optimal method based on the back-tracing algorithm is presented for calculating the entire system restoration plan. The simulation results of the Shandong Power System in China demonstrate that the proposed decision-making structure fits to large-scale power system hierarchical dispatching and satisfies the coordination of various dispatching demand in different levels.
出处 《中国电机工程学报》 EI CSCD 北大核心 2007年第1期8-13,共6页 Proceedings of the CSEE
基金 教育部新世纪优秀人才支持计划项目2005[35]~~
关键词 电力系统恢复 主从递阶决策 回溯算法 大停电 黑启动 power system restoration leader-follower hierarchical decision back-tracing algorithm blackout black start
  • 相关文献

参考文献11

  • 1Teo C Y, Jiang W, Gooi H B. Review of restoration strategies and a real time knowledge based approach for bulk power system restoration[J]. Knowledge-Based Systems, 1996, 9(1):15-21.
  • 2邱晓燕,唐海平,李兴源,王贵德,刘俊勇,林伟.基于专家系统和数值计算的电力系统恢复[J].中国电机工程学报,1996,16(6):413-416. 被引量:5
  • 3Fountas N A, Hatziagyriou N D. Hierarchical time-extended petri nets as a generic tool for power system restoration[J]. IEEE Trans. on Power Systems, 1997, 12(2):837-843.
  • 4Teo C Y, Jiang W. Adaptive real-time knowledge based approach for bulk power system[J]. Electric Machines and Power Systems, 1997,25: 1079-1088.
  • 5Wu J S, Liu C C. A petri net algorithm for scheduling of generic restoration actions[J]. IEEE Trans. on Power Systems, 1997, 12(1):69-76.
  • 6Kostic T, Cherkaoui R, Pruvot P. Decision aid function for restoration of transmission power systems: conceptual design and real time consideration[J]. IEEE Trans. on Power Systems, 1998, 13(3):923-929.
  • 7Islam S, Chowdhury N. A case-based windows graphic package for the education and training of power system restoration[J]. IEEE Trans. on Power Systems, 2001, 16(2): 181-187.
  • 8Bretas A S, Phadke a G. Artificial neural networks in power system restoration[J]. IEEE Trans. on Power Systems, 2003, 18(4):1181-1186.
  • 9Nagata T, Sasaki H. A multi-agent approach to power system restoration[J]. IEEE Trans. on Power Systems, 2002, 17(2):457-462.
  • 10王洪涛,刘玉田,邱夕照.基于分层案例推理的黑启动决策支持系统[J].电力系统自动化,2004,28(11):49-52. 被引量:47

二级参考文献20

  • 1[1]Adibi M M, Borkoshi J N, Kafka R J. Power System Restoration--The Second Task Force Report. IEEE Trans on Power Systems, 1987, 2(4): 927~933
  • 2[4]Lin C C, Liou K L, Chu R F, et al. Generation Capability Dispatch for Bulk Power System Restoration: A Knowledge based Approach. IEEE Trans on Power Systems, 1993, 8(1):316~325
  • 3[5]Teo C Y, Shen W. Development of an Interactive Rule-based System for Bulk Power System Restoration. IEEE Trans on Power Systems, 2000, 15(2): 646~653
  • 4[7]Islam S, Chowdhury N. A Case-based Windows Graphic Package for the Education and Training of Power System Restoration.IEEE Trans on Power Systems, 2001, 16(2): 181~187
  • 5[8]Barry S, Mark T K, Padraig C. Hierarchical Case-based Reasoning Integrating Case-based and Decompositional Problemsolving Techniques for Plant-control Software Design. IEEE Trans on Knowledge and Data Engineering, 2001, 13(5) : 793~812
  • 6[10]Fink L H, Liou K L, Liu C C. From Generic Restoration Actions to Specific Restoration Strategies. IEEE Trans on Power Systems, 1995, 10(2): 745~752
  • 7唐海平,硕士学位论文,1995年
  • 8Shultz R D,Mason G A.Blackstart utilization of remote combustion turbines[J].IEEE Trans on PAS,1984,103(8):2188-2191.
  • 9Lindstorm R R.Simulation and field tests of the black start of a large coal-fired generating station utilizing small remote hydro generation[J].IEEE Trans on Power Systems,1990,5(1):162-168.
  • 10Zhu Y L,Sutanto D,Morrison I F.Graphic-assisted expert system for power system black restart[A].Proceedings of International Conference on Advances in Power System Control,Operation and Management[C].HongKong,1991,1:443-448.

共引文献86

同被引文献288

引证文献17

二级引证文献237

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部