基于系统动力学的半导体生产线投料策略 被引量:2

System Dynamics Based Release Policy for Semiconductor Wafer Fabs
在线阅读 下载PDF
导出
摘要 在综述半导体生产线投料策略研究现状的基础上,提出了半导体生产线投料策略的系统动力学模型,并以半导体生产线简化模型为例,给出了半导体生产线投料方法的计算流程,进行了半导体生产线投料仿真实验,仿真结果表明,基于系统动力学的半导体生产线投料策略有改进半导体生产线性能的潜力。 Based on the summarization of state-of the-art release policies, the system dynamics model for solving release policies for the semiconductor wafer fahs was proposed. Meanwhile, the calculation flow of the proposed method was given. Based on the proposed method, the release rate is easily calculated if the input parameters and the goal are set. A simplified semiconductor wafer lab model was used to verify the proposed method's validity. It can be seen from the simulation results that the system dynamics based release polity has the potentiality to improve the performance of the semiconductor wafer labs.
机构地区 同济大学
出处 《中国机械工程》 EI CAS CSCD 北大核心 2006年第23期2507-2511,共5页 China Mechanical Engineering
基金 国家自然科学基金资助项目(70531020 60374005) 国家重点基础研究发展计划资助项目(2002CB312202)
关键词 半导体生产线 投料策略 系统动力学 仿真 semiconductor wafer tab release policy system dynamics simulation
  • 相关文献

参考文献8

  • 1李莉,乔非,吴启迪.半导体生产线群体智能调度模型研究[J].中国机械工程,2004,15(22):2006-2009. 被引量:7
  • 2LiLi FeiQiao WuQidi.SWARM INTELLIGENCE BASED DYNAMIC REAL-TIME SCHEDULING APPROACH FOR SEMICONDUCTOR WAFER FAB[J].Chinese Journal of Mechanical Engineering,2005,18(1):71-74. 被引量:4
  • 3Wein L M.Scheduling Semiconductor Wafer Fabrication[J].IEEE Transactions on Semiconductor Manufacturing,1988,1(1):115-129.
  • 4Spearman M L,Woodruff D L,Hopp W J.CONWIP:a Pull Alternative to Kanban[J].International Journal of Production Research,1990,28(8):879-894.
  • 5Glassey C R,Resende M G C.Closed-loop Job Release Control for VSL1 Circuit Manufacturing[J].IEEE Transactions on Semiconductor Manufacturing,1988,1(1):36-46.
  • 6Glassey C R,Resende M G C.A Scheduling Rule for Job Release in Semiconductor Fabrication[J].Operations Research Letters,1988,7(3):213-217.
  • 7Fowler J W,Hogg G L,Mason S J.Wordload Control in the Semiconductor Industry[J].Production Planning & Control,2002,13(7):568-578.
  • 8林哲充.电炉炼轧钢业动态营运模式之研究-以T公司为例[D].花莲:国立中山大学资讯管理研究所,2000.

二级参考文献24

  • 1Hunter J, Delp D, Collins D, et al. Understanding a semiconductor process using a full-scale model. IEEE Transactions on Semiconductor Manufacturing, 2002, 15(2): 285~289.
  • 2Xue D, Sun J, Norrie D H. An intelligent optimal production scheduling approach using constraint-based search and agent-based collaboration.Computers in Industry, 2001,46(5): 209~231.
  • 3Sung C S, Choung Y I, Hong J M, et al. Minimizing makespan on a single burn-in oven with job families and dynamic job arrivals. Computers & Operations Research, 2002, 29(10): 995~1007.
  • 4Tsai C H, Feng Y M, Li R K. A hybrid dispatching rules in wafer fabrication factories. International Journal of the Computer, the Internet and Management, 2003, 11(1): 64~72.
  • 5Lee Y H, Park J, Kim S. Experimental study on input and bottleneck scheduling for a semiconductor fabrication line. IIE Transactions, 2002,34(2): 179~190.
  • 6Kim S, Yea S H, Kim B. Shift scheduling for steppers in the semiconductor wafer fabrication process. IIE Transactions, 2002, 34(2): 167~177.
  • 7Dabbas R M, Chen H N, Fowler J W, et al. A combined dispatching criteria approach to scheduling semiconductor manufacturing systems.Computers & Industrial Engineering, 2001,39(3): 307~324.
  • 8Wein L M. Scheduling semiconductor wafer fabrication. IEEE Transac tions on Semiconductor Manufacturing, 1988, 1(1): 115~129.
  • 9Dorigo M, Caro G D, Gambardella L M. Ant algorithms for discrete optimization. Artificial Life, 1999, 5(2): 137~172.
  • 10Dorigo M, Maniezzo V, Colorni A. The ant system: optimization by a colony of cooperating agents. Transactions on Systems, Man, and Cybernetics-Part B, 1996, 26(1): 1~13.

共引文献8

同被引文献18

  • 1郭永辉,钱省三.基于鼓-缓冲器-绳子理论的半导体晶圆厂车间层控制[J].计算机集成制造系统,2006,12(1):111-116. 被引量:10
  • 2钮轶君,钱省三,任建华.ARIMA模型在半导体产品需求预测上的应用[J].半导体技术,2007,32(5):391-393. 被引量:7
  • 3WEIN L M. Scheduling semiconductor wafer fabrication[J]. IEEE Transactions on Semiconductor Manufacturing, 1988, 1 (1) :115-129.
  • 4NG T S, FOWLER J. Semiconductor production planning using robust optimization[C]//Proceedings of Industrial Engineering and Engineering Management. Washington, D. C. , USA : IEEE, 2007 : 1073-1077.
  • 5HOOD S J, BERMON S, BARAHONA F. Capacity planning under demand uncertainty for semiconductor manufacturing [J]. IEEE Transactions on Semiconductor Manufacturing, 2003,16(2) :273-280.
  • 6TOWILL D R. Dynamic analysis of an inventory and order based production control system[J]. International Journal of Production Research,1982,20(6) :671-687.
  • 7JOHN S, NAIM M M, TOWILL D R. Dynamic analysis of a WlP compensated decision support system[J]. International Journal of Manufacturing System Design, 1994,1(4) :283-297.
  • 8DISNEY S M, TOWILL D R. A discrete linear control theory model to determine the dynamic stability of vendor managed inventory supply chains [J]. International Journal of Production Research,2002,40(1):179-204.
  • 9LALWANI C S, DISNEY S M, TOWILL D R. Controllable, observable and stable state space representations of a generalized order-up-to policy[J]. International Journal of Production Economics, 2006,101 ( 1 ):172-184.
  • 10BOX G, JENKINS G M, REINSEL G. Time series analysis: forecasting and control[M]. 3rd ed. Upper Saddle Rive, N. J. , USA : Prentice Hall, 19 9 4 : 6 9.

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部