4ERIC HIRST,BRENDAN KIRBY.Costs for electric-power ancillary services[J].The Electricity Journal,1996,9(10):26-30.
5KONSTANTIN STASCHUS.Review of german approaches to ancillary services costing and pricing[C].//Proceedings of IEE Colloquium on Pricing of Ancillary Services.London(UK):1996.
6GRAEME A,CHOW N,BRIAN WIGDOROWIT Z.A methodology for the redesign of frequency control for AC networks[J].IEEE Transaction on Power Systems,2004,19(3):1546-1554.
7REASON J.When a slower ramp rate makes economic sense[J].Electrical World,1988,4:38-39.
8BRANDWAJN V,LPAKCHI A,SHERKAT V.Tracking evolutionary trends in generation control[J].IEEE Computer Application in Power,1993,1(6):22-26.
9ERIC HIRST.Maximizing generator profits across energy and ancillary-services market[J].The Electricity Journal,2000,13(5):61-69.
10HARRY SINGH.Auctions for ancillary services[J].Decision Support Systems,1999,24:183-191.