摘要 以某公路大跨隧道为背景介绍了在隧道开挖过程中围岩压力及变形受开挖影响所产生的变化,通过对实测数据的分析,指导施工中支护参数的调整,与理论公式进行对比选定合理的公式、确定准确的地质参数,预测下段施工围岩压力及变化。 Taking a large-spanned tunnel on a highway as an example, the article describes the variations of the pressures and deformations of the surrounding rock mass caused by the tunnel excavation. By means of analysis on the measured data, guidance is provided for the adjustment of the reinforcement parameters during the tunnel construction. By means of comparison with the theoretical formulas, proper formulas are selected, accurate geological parameters are determined and the pressures and changes of the surrounding rock mass ahead of the working face are predicted.
作者 巴放
出处 《隧道建设》 2006年第5期17-20,共4页 Tunnel Construction
关键词 隧道施工 围岩压力 地质参数 变形分析 tunnel construction pressure of surrounding rock mass geological parameters deformation analysis
  • 相关文献

参考文献3

  • 1[1]铁道部第二工程局.铁路工程施工技术手册隧道分册[M].北京:中国铁道出版社,1998
  • 2[2]铁道部基本建设总局准科情报所.铁路隧道新奥法指南[M].北京:中国铁道出版社,1988
  • 3[5]铁道部人事司.隧道及地下工程[M].成都:西南交通大学出版社,2002.

共引文献1

同被引文献43

引证文献5

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部