坝下游面钢衬钢筋混凝土管道结构优化布置 被引量:11

Optimization of arrangement of steel lining reinforced concrete penstocks on the downstream surface of dams
在线阅读 下载PDF
导出
摘要 本文从管道截面形状、钢材用量和钢筋布置、钢衬外包混凝土厚度,管道与坝体相对位置及接缝处理四个方面,论述坝下游面钢衬钢筋混凝土管道结构设计的优化方法和原则。结合某水电站工程的实际,从优选的角度对该工程坝下游面钢衬钢筋混凝土管道的布置进行对比分析,表明从减小管线长度、节省工程投资的角度出发,建议采用半埋,外包1.5m厚混凝土的结构布置形式。 From the section shape of penstocks, allocation of steel and arrangement of reinforcing bar, thickness of concrete around steel pipe as well as the interface between the dam and the penstock, the optimization method and principle of structural design of steel lining reinforced concrete penstocks on the downstream surface of dams have been discussed. In accordance with the practice of Jinanqiao hydropower station, contrastive analysis on the arrangement of this kind of penstock has been carried out by means of optimization method. An arrangement of semiburied type with 1 .5in-thick concrete wall is suggested in order to reduce the length of pipe line and economize the investment of the engineering.
出处 《水力发电学报》 EI CSCD 北大核心 2006年第4期96-101,共6页 Journal of Hydroelectric Engineering
关键词 水工结构 结构优化布置 有限单元法 背管 钢衬钢筋混凝土 钢材配置 管坝接缝面 hydraulic structure structural optimization finite element method penstocks on downstream surface of dams reinforced concrete with steel liner allocation of steel interface between dam and penstock
  • 相关文献

参考文献8

  • 1陈际唐.三峡电站引水压力管道设计研究[J].水利水电快报,1997,18(12):1-5. 被引量:9
  • 2蒋锁红.水电站坝后背管规范内容介绍[J].水电站压力管道[C]:武汉:湖北科学技术出版社,2002.
  • 3马善定 周润坚 等.混凝土坝下游面钢衬钢筋混凝土压力管道的强度和变形[J].水力发电学报,1988,(4):18-23.
  • 4.DL/T 5141-2001,水电站压力钢管设计规范[S].北京:中国电力出版社,2002..
  • 5路振刚,张宝光,荆岫岩.压力钢管结构的优化设计[J].水力发电,1993,20(8):26-29. 被引量:5
  • 6刘宁,乐东义,刘劲松.三峡电站下游坝面钢衬钢筋混凝土管道结构设计[J].人民长江,1997,28(10):21-23. 被引量:3
  • 7伍鹤皋,马善定.金安桥水电站坝后厂房方案压力背管结构布置及应力与变形专题研究[R].武汉大学水利水电学院,2004.
  • 8DL 5077-1997,水工建筑物抗震设计规范[S].北京:中国电力出版社,1997.

二级参考文献5

共引文献16

同被引文献126

引证文献11

二级引证文献59

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部