摘要 以非线性有限元方法为基础,考虑桥节间非线性连接的影响,建立了浮桥三维动力响应分析控制方程,并采用超单元方法对系统的运动方程进行缩减;然后用Newmark直接积分和New-ton-Raphson迭代方法求解系统的非线性运动方程,研究了移动载荷作用下非线性连接浮桥的三维非线性动力响应特性.研究表明,桥节之间连接的非线性特性和间隙的大小对于浮桥的动力响应影响很大,必须加以考虑. Based on 3D nonlinear finite element method, the motion equations for a nonlinearly connected floating bridge considering the nonlinear properties of connectors were proposed. The super-element method was used to reduce the calculation scale, and the direct integration and Newton-Raphson iteration method were applied to solve the reduced equations. The dynamic displacement and connection forces characteristics of a floating bridge with nonlinear connecters subjected to moving loads were investigated. It was found that the nonlinear properties and initial gap of the connectors are important for the dynamic response of a nonlinearly connected floating bridge.
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2006年第6期1004-1009,共6页 Journal of Shanghai Jiaotong University
基金 国家自然科学基金资助项目(50309018)
关键词 浮桥 移动载荷 动力响应 间隙 非线性 floating bridge moving loads dynamic responses gap nonlinear
  • 相关文献

参考文献5

  • 1Wu J S,Sheu J J.An exact solution for a simplified model of the heave and pitch motions of a ship hull due to a moving load and experimental results[J].Journal of Sound and Vibration,1996,192 (2):495-520.
  • 2Wu J S,Shih P Y.Moving-load-induced vibrations oa moored floating bridge[J].Computers and Structures,1998,66(4):435-461.
  • 3Ertekin R C,Riggs R H,Kim J W,et al.Hydroelastic analysis of floating bridges in current//20th International Conference on Offshore Mechanics and Arctic Engineering[C].Rio de Janeiro:ASME,2001:CDROM-OMAE01-5029.
  • 4Fleischer D,Park S K.Plane hydroelastic beam vibrations due to uniformly moving one axle vehicle[J].Journal of Sound and Vibration,2004,273 (3):585-606.
  • 5傅世晓,崔维成,林铸明,陈徐均.间隙对拼组式浮桥静态响应的影响分析[J].船舶力学,2004,8(4):86-94. 被引量:16

二级参考文献20

  • 1施博云.[D].台湾: 台湾成功大学造船工程学系,1982.
  • 2杨正言.[D].台湾: 台湾成功大学造船工程学系,1985.
  • 3Seif M S,Inoue Y.Dynamic analysis of floating bridges[J]. Marine Structures,1998,11(1/2):29-46.
  • 4McIver P. Wave forces on adjacent floating bridges[J]. Applied Ocean Research, 1986,8(2):67-75.
  • 5Langen I. Probabilistic methods for dynamic analysis of floating bridges[J]. Norwegian Maritime Research, 1983(1):2-15.
  • 6Lwin M M,Dusenberry D O.Responding to a floating bridge failure[J]. Public Works,Public Works Journal Corp.,1994,125:39-43.
  • 7Hasselo J A. Experiences with floating bridges[A].STRAIT CROSSINGS 2001,Editors:Krokeborg J,Proc.of 4th Symposium on Strait Crossing[C],BERGEN,NORWAY,2001.333-337.
  • 8Landet E. Planning and construction of floating bridges in Norway[A]. Proceedings of International Workshop on Floating Structures in Coastal Zone[C], Japan,1994.43-55.
  • 9Maruyama T, Kawamura Y, Tsuda T, Kishimoto T,Tanaka H,Yasuda Y. Plan and design of Yumeshima-Maishima Bridge (The First)-Movable floating bridge[J]. Bridge and Foundation,1998,32(2).
  • 10Maruyama T, Kawamura Y, Tsuda T, Takeda S, Nakaji E, Oka S, Tsutiya M. Plan and design of Yumeshima-Maishima Bridge (The Seeond)-Movable floating bridge[J]. Bridge and Foundation, 1998b,32(3).

共引文献15

同被引文献72

引证文献11

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部