期刊文献+

基于BSC的ERP实施绩效评价研究 被引量:11

A Study on the Performance Evaluation of ERP Implementation Based on BSC
在线阅读 下载PDF
导出
摘要 在ERP实施绩效评价的现状分析的基础上,结合ERP实施的总体目标,提出了基于BSC(Balanced Scorecard,平衡积分法)的ERP实施绩效评价指标体系,同时运用专家综合评价方法,进行了应用举例。 On the basis of analysis about current situation and method of ERP implementation performance evaluation, it consideres the general ERP implementation aims, proposes a index system based on BSC(Balanced Scorecard). The expert evaluation method is used in the performance evaluation. A simple case validates the rationality and feasibility of the method.
出处 《中国制造业信息化(学术版)》 2006年第7期19-22,共4页
基金 国家自然科学基金项目(70272047) 广东高校人文社科基金项目(02SJA630007)
关键词 ERP实施 绩效评价 BSC ERP Implementation Performance Evaluation BSC
  • 相关文献

参考文献2

  • 1Delone WH, Mclean ER. Information system success: the quest for the dependent variable[J ]. Information Systems Research,1992, 3(1): 60-95.
  • 2Robert S Kaplan, David P Norton. The balanced scorecard:measttres that drive performance [ J ]. Harvard Business Review,1992, 70(1): 71-79.

同被引文献58

引证文献11

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部