摘要
本文阐述了驼峰解体作业潜在危险产生的机理,给出了危险度确定方法,在评价过程中,找出不安全因素,改善作业方式。
The mechanism of potential dangerous in hump dissoluting operation is expounded with the calculation method of criticality proposed.The paper has also looked for danger factors,improving operation pattern and reducing human harm during the evaluation process.
出处
《西南交通大学学报》
EI
CSCD
北大核心
1996年第3期292-295,共4页
Journal of Southwest Jiaotong University