羊湖电站调压井施工技术措施 被引量:2

Technical Measures in Construction of Surge Chamber at Yangzhuoyong Lake Project
在线阅读 下载PDF
导出
摘要 西藏羊湖电站水头高达1020m(含水锤升压),又系三机式蓄能(发电抽水机组),调压井在整个工程中起着非常重要的作用,它位于海拔4440m高程以上、设计为上室差动式,其结构由上室和下部竖井组成。本文简要介绍了在海拔高、气压低、严寒缺氧地区采用光面爆破开挖调压井竖井,滑模工艺浇筑竖井钢筋混凝土的施工技术。 Water head of Yangzhuoyong Lake project is up to 1020m(with water hammer pressure).There are three pumped storage generator units in total capacity. Therefore,the surge chamber plays a very important role in the whole project. The surge chamber is located above the elevation of 4440m.It is designed as upper surge chamber and differential surge chamber.It is consisted of the upper surge chamber and lower shaft. This paper briefly introduces the construction technique for excavation of the shaft by smooth blasting and placing of reinforced concrete by sliding formwork in such a high elevation,low air pressure,severely cold and oxygen lacking area.
作者 李宏国
出处 《四川水力发电》 1996年第1期21-24,共4页 Sichuan Hydropower
关键词 抽水蓄能水电站 调压井 光面爆破 滑模 工程施工 surge chamber upper surge chamber shaft smooth blasting sliding form work
  • 相关文献

同被引文献7

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部