摘要
羊湖电站引水隧洞长5883.103m,内径2.5m,海拔高程4400m以上,是目前世界上海拔最高的引水隧洞.具有海拔高、断面小、隧洞长、施工难度大等特点.本文就羊湖电站引水隧洞的施工组织与管理作一简要介绍,为在高寒缺氧地区进行隧洞施工提供一些可借鉴的经验.
The Power tunnel at Yangzhuoyong Lake project is located above the elevation 4400m. No other hydropower project is located in such a high elevation at present.The length of the tunnel is 5883. 103m with internal diameter of 2. 5m. The project is featured by high elevation,small section,long tunnel and difficult construction. Construction program and control of the power tunnel at the Yangzhuoyong Lake project is briefly introduced for reference of other tunnelling in very cold and oxygen lacking area.
出处
《四川水力发电》
1996年第1期4-9,共6页
Sichuan Hydropower
关键词
引水隧洞
水电站
施工组织管理
光面爆破
Yangzhuoyong Lake project Power tunnel smooth blasting concrete lining construction control