摘要
通过在施工准备阶段对施工进度网络计划进行PERT网络模型计算机仿真,能够得出工期的概率分布和均值、各工序处于关键线路上的概率以及可引起关键线路转移的主要工序等,从而科学合理地安排施工,以最优的时间和资源消耗来达到整个工程的工期目标。
Through carrying on the PERT network at the beginning of construction, the rate distributes and average value of construction duration can be got, each work preface is placed in the key circuit up of all rate and the main working preface that the key circuit transfer can be caused etc., thus the construction is scientifically arranged and the construction target can be achieved under the superior time and resources.