论烟气脱硫工程省却GGH的可行性 被引量:8

The Feasibility for Cancelling GGH in Flue Gas Desulfurization(FGD) Project
在线阅读 下载PDF
导出
摘要 文章介绍了烟气换热器(简称GGH)在烟气脱硫(简称FGD)工程中的作用,通过对GGH净烟气侧下游的腐蚀、烟气系统的能耗、总建设投资、运行成本及维护费等方面分析比较设置GGH的利弊,论证了烟气脱硫工程省却GGH的可行性,并对省却GGH后产生的问题提出了对策。 The thesis introduce the function to gas-gas heater (hereafter refer to GGH) in Flue Gas Desulphurization (FGD) project. The advantage and disadvantage of setting GGH is clearly illustrated by analyzing the corrosion to downstream GGH clean side, the consumption of flue gas system, total construction investment and operation and maintenance costs ect . The thesis demonstrates the feasibility of canceling GGH in FGD project and also gives out solutions to the problems caused by cancellation of GGH.
作者 胡彩云
出处 《湖南有色金属》 CAS 2006年第2期44-47,共4页 Hunan Nonferrous Metals
关键词 烟气脱硫 GGH 可行性 烟气换热器 Flue Gas Desulphurization cancellation GGH feasibility
  • 相关文献

参考文献2

  • 1曾庭华,杨华,马斌,等.湿法烟气脱硫系统的安全性及优化[M].北京:中国电力出版社,2003.
  • 2GB13223—2003.火电厂大气污染物排放标准.[S].,..

共引文献6

同被引文献77

引证文献8

二级引证文献84

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部