摘要
本文就石灰石—石膏湿法烟气脱硫工艺是否安装烟气换热器(GGH)作了相关探讨,并得出今后建设的烟气脱硫设施不宜再安装烟气换热器的结论。
The paper probes into whether to install GGH concerning limestone-gypsum wet process of FGD technology, and concludes that it is inadvisable to install GGH in the construction of FGD facility for the future.
出处
《中国环保产业》
2005年第8期7-9,共3页
China Environmental Protection Industry