摘要
着重分析了石灰石/石膏湿法烟气脱硫(FGD)系统中的吸收塔、浆液循环泵、烟气换热器、增压风机、除雾器等运行情况,并提出优化运行建议。同时从脱硫剂消耗、电耗、水耗、系统运行成本等方面对系统运行状况进行了评价。
Important equipment, like the absorption tower, the slurry circulation pump, the flue gas heat exchanger, the supercharging fan and the demister are being analyzed, in respect to their functions, together with recommendations concerning their optimized operation. Simultaneously, considering the consumption of power and dest, lfurizing agents, the system's cost of operation is being discussed and evaluated.
出处
《发电设备》
2006年第2期134-138,共5页
Power Equipment
关键词
能源与动力工程
锅炉
大气宁亏染
烟气脱硫
吸收塔
优化运行
energy and power engineering
boiler
atmospheric pollution
flue gas desulfurization
absorption tower
optimized operation