详细叙述整体道床拨接的技术难点和施工措施,介绍上海地铁1号线上海南站改造工程在国内首次实现了在不中断地铁运营的情况下整体道床拨接的情况。
Technical difficulties and construction measures of track connection of monolithic track bed are expatiated. For the first time in China, the monolithic track bed connection is successfully carried out without interrupting train operation while Shanghai metro line 1 is under renovation.