摘要
比较国内外常用的几种模拟方法后,讨论了发电顺序与抽水顺序的对应问题和在模拟过程中对已预先安排好的发电/抽水顺序进行改变的问题,并用不同的模拟方法对同一个系统进行了分析、计算,对结果进行了分析.
Taking pumped-storage plants as examples,this paper investigates and compares several algorithms used at present for probabilistic production costing of a powersystem including multiple independent storage plants, and discusses three problems: (1)charging/discharging ordering of storage plants;(2) corelation between charging and discharging queue of a storage plant;(3) the possibility of changing the predetermined charging/discharging queue in a simulation process.A real size power system with five pumped -storage plants is calculated and analyzed by different algorthms.
出处
《水电能源科学》
北大核心
1996年第1期15-21,共7页
Water Resources and Power
基金
国家自然科学基金