期刊文献+

工程成本人文风险及其转化 被引量:1

Identification and Transformation of Cultural Risks in Construction Costs Management
在线阅读 下载PDF
导出
摘要 工程成本管理总是处在一定的人文环境之中,研究工程成本管理中的人文风险因素及其转化和利用,是防范和化解工程成本风险,提高工程成本管理水平的需要。本研究按照人文因素作用于工程成本的方式,构建出以冲突、低绩效和额外支出为维度的工程成本人文风险形成模式;区分传承性、渐变性和突发性人文风险因素,设计了工程成本管理人文风险因素识别表;以适应、引导、影响和合作为维度,建立了工程成本管理人文风险转化模式。最后,借用风险识别、度量、应对和控制的概念,构造出工程成本人文风险管理模式。这一模式的关键特征,在于工程成本人文风险管理是一个以人文风险的转化和利用为管理主轴的循环过程,人文风险形成模式、人文风险识别表、人文风险转化模式统一在其中。 Construction costs management is influenced by the cultural environment and it would be promoted through the transformation of cultural risks. Four models are built in the paper. First, the model of cultural risk influences to construction costs is given with dimensions of conflict, poor performance and extra - cost. Second, table to identification of cultural risks in construction cost management is drown based on identifying cultural risk factors of handing, changing and bursting. Third, model to transformation of cultural risks in construction cost management is designed on the dimensions of positive fit, positive lead, positive influence and positive cooperation. And finally, a synthesis model of cultural risks management in construction cost which employed the conceptions of identification, quantification, response development and control is built. The key features of the integrated model are that the management of cultural risks in construction cost cycles the transformation and utilization of cultural risks and, the three models of others are integrated in it.
出处 《基建优化》 2005年第5期8-12,共5页 Optimization of Capital Construction
基金 河南省社会科学规划项目(2001EZH005)
关键词 人文 工程成本 风险管理 工程管理 cultural factors construction costs risk management project management
  • 相关文献

参考文献13

  • 1陈思刚,赵翔.岩土工程项目管理与项目工程环境和人文环境之间的关系[J].西北水电,2002(2):4-6. 被引量:1
  • 2狄卫民,王梅杰,刘剑荣.基于道德风险防范的建设工程管理机制探讨[J].西安科技大学学报,2004,24(4):522-526. 被引量:6
  • 3吴增玉,西宝,刘长滨.中美建设工程风险管理体系比较研究[J].建筑经济,1999(3):10-13. 被引量:11
  • 4Chan,E.H.Amicable Dispute Resolution in the PRC: Implication for Foreign-related Construction Disputes. Construction Management and Economics,1997,15(6):539-548.
  • 5D.Bower,G.Ashby,K.Gerald,W.Smyk.Incentive Mechanisms for Project Success. Journal of Management in Engineering,2002,18(1):37-42.
  • 6Edwin H.W.Chan, Raymond Y.C.Tse.Culture Considerations in International Construction Contracts. Journal of Construction Engineering and Management,2003,129(4):375-381.
  • 7Fellow,R.F., Hancock,R.Conflict Resulting from cultural Differentiation: An Investigation of the New Engineering Contract. Council of International Construction Research and Documentation Process on Construction Conflict: Management and Resolution. Rotterdam, The Netherlands,1994:259-267.
  • 8Frame J. Davidson.Establishing Project Risk Assessment Teams. Kahkonen Kalle and Artto Karlos (Eds), Managing Risks in Projects. London: E&FN Spon,1997:22-27.
  • 9John Bennett.Construction-The Third Way. First Published by Butterworth-Heinemann Press. Oxford, UK.2000,8(22):69-80,165-168.
  • 10Mohamed Attala,P.E., Tarek Hegazy,P.E.Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks Versus Regression. Journal of Construction Engineering and Management,2003,129(4):405-411.

二级参考文献9

共引文献15

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部