摘要
结合太钢不锈冷轧厂房柱基的施工实践,就保护原厂房柱基的方案进行了分析研究,介绍了实施保护的思路及施工工艺,并对结构设计及实施效果作了探讨,提出了几点体会。
Combined with pile foundation work in Taiyuan Iron and Steel Corporation the construction scheme to protect exited pile foundations are studied. The precast pile is introduced. Practical structural design and treatment effect are discussed. In the end some experiences are summarized.
出处
《山西建筑》
2005年第18期118-119,共2页
Shanxi Architecture
关键词
预制桩
柱基
沉降观测
precast pile, pile foundation,settlement observation