南京地铁1号线一期工程系统总联调的进度控制 被引量:4

Schedule Control in System Integrated Test in the First Stage of Construction of Nanjing Metro Line 1
在线阅读 下载PDF
导出
摘要 根据项目时间管理的相关理论,结合南京地铁1号线系统总联调的具体工作,通过生命周期划分、职责分配等项目管理方法,基于项目管理软件Project,设计并完成“南京地铁1号线系统总联调实施阶段工作时程图”,实现系统总联调的时间进度管理。 Based on the principles of Project-Time-Management (PTM), and combining with the systems integrated test of Nanjing Metro Line 1, and by the management methods of life-cycle partition and responsibility assignment, “The Practical Schedule Chart of System Integrated Test of Nanjing Metro Line 1” is designed and accomplished with Project application software. It is proved that the schedule control can be realized by using of it.
出处 《都市快轨交通》 2005年第4期17-21,共5页 Urban Rapid Rail Transit
关键词 南京地铁 进度控制 系统总联调 项目管理 地铁1号线 工程系统 联调 南京 项目管理软件 Project Nanjing metro schedule control system integrated test project management
  • 相关文献

参考文献3

  • 1American project management institute. A Guide to the project management Body of knowledge ( PM Book 2000) [ EB/ OL]. htttp ://www. china -dragons. com.
  • 2南京市地下铁道工程建设指挥部.南京地铁1号线一期工程系统总联调工作大纲[G].南京,2005..
  • 3周庆红.项目管理工具应用的研究[J].广东通信技术,2003,23(11):42-44. 被引量:2

共引文献1

同被引文献21

引证文献4

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部