期刊文献+

基于交货期的流水线车间调度算法设计与实现 被引量:4

The design and application of algorithm for flow-shop scheduling module base on consignment time
在线阅读 下载PDF
导出
摘要 这里提出了在流水线调度时可以利用遗传算法计算出工件的最短通过时间,但同时应考虑交货期的影响、设备的负荷率和员工加班等问题。在设计过程中,根据实际,改进常规遗传算法,设计出一种基于交货期的遗传算法,可以很快的收索到最优个体。实例证明了其可行性。 This paper introduces a method to design Job - shop scheduling module by using genetic algorithm, gains the leust process time of workpieces . In the same time, the infection of consignment time, the burthen of equipment and overtime should be considered. In the course of design, according to reality, this paper improves the ordinary genetic algorithm and designs a optimization scheduling algorithm base on the consignment time. It' s easy to find out optimum individual quickly. It also gives an example that proved it was feasible and effective approach method.
出处 《机械设计与制造》 北大核心 2005年第8期161-163,共3页 Machinery Design & Manufacture
基金 国家重点攻关资助项目(2003BA103C)
关键词 流水调度 遗传算法 交货 Flow - shop Genetic algorithm Consignment
  • 相关文献

参考文献5

二级参考文献8

共引文献23

同被引文献41

  • 1陈皓,陈铁英.用遗传算法求解柔性作业车间调度问题[J].兵工自动化,2004,23(4):14-15. 被引量:6
  • 2唐国春.2003年到2005年排序(调度)学科在中国的发展(I)[J].上海第二工业大学学报,2006,23(3):167-176. 被引量:3
  • 3Anger.F.D,Lee.C.Y,Martin-Vega. Single machine scheduling with tight windows [A]. Gaiuesile.FL. Research Report 86-16. Department of Industrial and System Engineering[ C ], University of Florida, 1988
  • 4Sidney.J.B. Optimal single machine scheduling with earliness and tardiness penalties[J ]. Operation Research, 1977,25( 1 ) :62--69
  • 5Lakshminarayan.S,Larkshmanan.R,Papinean.R.L. Optimal single machine scheduling with earliness and tardiness penalties [J]. Operations Research, 1978,26(6) : 1079-1082
  • 6李琦.机械加工生产管理系统与调度算法的设计与实现.鞍山科技大学学报,2003,(3):50-53.
  • 7郝文化.MATLAB图形图像处理应用教程[M].北京:中国水利水电出版社,2002
  • 8GRAVES S.A review of production scheduling[J].Operations Research,1981,29(4):646-675.
  • 9ISHIBUCHI H,MURATA T.A multi-objective genetic local search algorithm and its application to flowshop scheduling[J].IEEE Trans Syst Man Cybern C,1998(28):392-403.
  • 10CHANG P C,HSIEH J C,LIN S G.The developme,nt of gradual priority weighting approach for the multi-objective flowshop scheduling problem[J].Int J Prod Econ,2002(79):171-183.

引证文献4

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部