摘要 结合厦门火车站至和平码头5.3km既有铁路线已经停用以及福厦线引入厦门地区段增建二线后能力有较大富余的实际情况,从降低建设成本以及资金筹措、城市土地利用等角度出发,提出了厦门城市轨道交通1号线线路走向的调整方案,并在此基础上提出了充分利用既有铁路资源的四个方案和相应的实施方案建议。 Considering the surplus capacity of the abolished railways between Xiamen Railway Station and Peace Dock Station (5.3 km) and the newly built Fu-Xia Line in Xiamen area,the authors suggest that the alignment of Xiamen UMT Line 1,shall be re-adjusted so as to use the existing railways,and propose 4 alternative ways and the corresponding advices of implementation,which will cut off the construction cost and save the urban land.
作者 叶霞飞 王治
出处 《城市轨道交通研究》 2005年第2期58-61,共4页 Urban Mass Transit
  • 相关文献

参考文献5

二级参考文献3

  • 1[4]Cervero R.Rail transit and development.Jounal of the American Planning Association,1994,60(1)
  • 2[5]Keefer,L.A Review of Nine UMTA-Assisted Joint Development Project.Washington: Urban Mass transportation Administra tion,1994
  • 3吴洁,宋晓满.城市轨道交通建设与周边经济开发的互动[J].城市轨道交通研究,2001,4(1):18-20. 被引量:7

共引文献41

同被引文献6

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部