摘要
介绍北京地铁10号线与5号线的区间联络线隧道多种施工方案,以及过河施工洞内、外所采取的措施,通过比选确定该段过河应采取的施工方案,从而达到安全、经济、快速的目的。
Several construction schemes for a tunnel between line 10 and line 5 of Beijing metro are introduced. The measures of inside and outside river - crossing tunnel construction are presented. In view of safety, economy and high efficiency, the last river - crossing construction scheme is determined.
出处
《都市快轨交通》
2005年第2期43-46,共4页
Urban Rapid Rail Transit
关键词
暗挖隧道
比选
施工方案
北京地铁
联络线
metro tunnel
river - crossing
intensify small pipe
horizontal rotary jet grouting pile
deep bored grouting