期刊文献+

基于大滞后补偿技术的锅炉再热汽温控制系统 被引量:4

The Reheat Steam Temperature Control System Based on Large-lag Compensated Technique of Boiler
在线阅读 下载PDF
导出
摘要 针对江苏南热发电有限责任公司5号机组再热汽温被控对象滞后大的特点,综合采用状态变量控制技术、相位补偿技术及自适应Smith预估补偿等多种大滞后控制技术,设计了新型的再热汽温控制系统。实际运行表明,采用先进控制技术的再热汽温控制系统,在机组升、降负荷及启、停制粉系统的过程中,均使锅炉再热汽温严格控制在允许的范围内,是一种对锅炉汽温比较有效的控制方法。 For the large-lag features of reheat steam temperature controlled object on 5 unit of Jiangsu Nanjing Thermal Electrical Power Plant,this paper redesigns the original reheat steam temperature control system by integrating several large-lag compensated control techniques such as the state-variable control,the phase compensated and adaptive smith compensated techniques synthetically. The practical running results show that this new temperature control system can austerely ensure the reheat steam temperature of boiler within a permitted range during the normally change of the load of unit and startup or shutdown the pulverized coal preparation system. Hence,the method proposed in this paper is rather effective.
出处 《江苏电机工程》 2005年第2期58-60,共3页 Jiangsu Electrical Engineering
关键词 再热汽温 锅炉 大滞后对象 补偿技术 串级控制系统 reheat steam temperature boiler large-lag object compensated technique cascade control system.
  • 相关文献

参考文献2

二级参考文献2

共引文献25

同被引文献36

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部