摘要 在柔性约束规划概念的基础上,加入发电出力调整部分,分别对同步和异步规划这两种可能解决的方法进行建模、求解,并与传统的规划方法分别进行了比较.在证明其经济性、可行性的同时,分别讨论了它们的优缺点. Based on the concept of planning with flexible constraints, two different mathematical models of adopting generation adjustment were established. As the generation is adjusted in different ways the two models are called synchronous planning and asynchronous planning respectively. Compared with each other and with traditional method, advantages and disadvantages of the models were discussed.
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2005年第3期417-420,共4页 Journal of Shanghai Jiaotong University
基金 国家自然科学基金资助项目(50177017)
关键词 电力系统规划 柔性约束 同步规划 异步规划 发电调整 Computer simulation Constraint theory Mathematical models Scheduling Strategic planning
  • 相关文献

参考文献3

二级参考文献26

  • 1张洪明,廖培鸿,仲建中.电网规划的灰色系统方法[J].电网技术,1995,19(12):19-23. 被引量:8
  • 2邓聚龙.灰色系统理论教程[M].武汉:华中理工大学出版社,1991..
  • 3王锡凡.电力系统优化规划[M].北京:水电出版社,1993..
  • 4毛玉滨 王秀丽 等.多阶段输电网最优规划的遗传算法[J].电力系统自动化,1998,22(12).
  • 5倪明,高晓萍,单渊达.证据理论在中期负荷预测中的应用[J].中国电机工程学报,1997,17(3):199-203. 被引量:23
  • 6Wang Zian,IEEE Trans Power Systems,1992年,7卷,3期
  • 7David A K,IEEE Trans Power Systems,1991年,6卷,1期
  • 8邓聚龙,灰色系统理论教程,1991年
  • 9谢敬东,电力系统及其自动化学报,1998年,10卷,2期
  • 10梁志珊,控制与决策,1998年,13卷,1期,86页

共引文献40

同被引文献37

引证文献2

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部