施工系统中混凝土拌和工厂位置选择综合评价模型 被引量:3

A model for locating concrete-mixing mills in construction site
在线阅读 下载PDF
导出
摘要 在大型水利水电工程施工系统中,混凝土拌和工厂位置选择涉及大量不确定性因素.本文用可能性-满意度来描述决策者对不确定性估计的主观性和客观性,论述了可能性与模糊集、满意度与信任度的对应关系,给出了可靠性-满意度的计算方法.以系统分析的层次性原理为基础,建立了厂址选择的综合评价模型.通过一个实例分析,得到几点结论. In the construction of large hydropower plant, there are a lot of uncertainty factors which affect the optimal location of concrete- mixing mills. This paper discusses that the decision-maker's subjectivity and objectivity for uncertainty estimate can be measured by its possibility -satisfaction index, and proves that there exist the correspondent relations between possibility and fuzzy set, satisfaction degnce and belief degree. Moreover, it gives the computational methods of possibility-satisfacton. A model of synthetic evaluation for locating concrete-mixing mills is established by means of the analytic hierarchy process, and some conclusions are illustrated by an example.
出处 《水利学报》 EI CSCD 北大核心 1994年第3期26-32,共7页 Journal of Hydraulic Engineering
关键词 混凝土拌和厂 工程施工 位置 选择 location choice, uncertainty estimate, possibility, satisfaction index.
  • 相关文献

参考文献6

  • 1陈--,决策分析,1989年
  • 2张连文,系统工程学报,1986年,1期
  • 3李仲篪,系统工程理论与实践,1985年,3卷,1期
  • 4王浣尘,系统工程理论与实践,1985年,3卷,1期
  • 5汪培庄,模糊集合论及其应用,1983年
  • 6王浣尘,系统工程理论与实践,1982年,2卷,1期