摘要
仙人陂水电站工程施工导流分两期进行,对二期截流时段和截流设计流量的确定、截流水力学计算和龙口分区、栽流的总体布置、截流材料与施工设备,龙口段的施工作了介绍。
Xian Ren Bei hvdroelectric station was carried out the construction diversion in two stages.This paper introduced the ditermination of tin1e intertal of second-stage closure,the closure design discharge, the closure liydraulic calculation,the general arrangement of cIosure works of Long-Kou subarea, the closure material and the construction installation the construction of Long-Kou section,etc。
出处
《江西水利科技》
1994年第4期317-322,共6页
Jiangxi Hydraulic Science & Technology
关键词
水电站
截流工程
设计
工程施工
Second-stage closure
Clost1re work
Design and construction