基于优先级权系数法的架空线路入地改造控制算法 被引量:4

RECONSTRUCTION SEQUENCE ALGORITHM FOR REPLACING OVERHEAD LINES BY UNDERGROUND CABLES BASED ON PRIORITY WEIGHTS METHOD
在线阅读 下载PDF
导出
摘要 在判断矩阵分析法的基础上,利用多目标权系数组合赋值方法将其改进,得到定量评价多对象优先程度的优先级权系数法,并将其应用于架空线路入地改造的控制规划中。该方法可全面地、有层次地对入地改造中的各种必要因素进行优化量化,依据数值结果规划架空线路的入地改造顺序,避免人为决策的主观性。浦东新区架空线路控制及入地改造的工程实践证明了该方法的有效性和先进性。 Improving the judgement matrix analytical method by multi-object weight combination value assignment, a priority weights method, which can quantitatively estimate the priority degree of multi-objects, is obtained and applied to the planning for reconstruction of replacing overhead lines by underground cables. The necessary factors in the reconstruction of replacing overhead lines by underground cables can be comprehensively and hierarchically optimized and quantitized by the present method and this reconstruction can be planned according to the numerical results of calculation to avoid the subjectivity from manmade decision. The presented method is proved to be effective and advanced by the practical planning of the reconstruction of overhead lines in new area of Pudong district in Shanghai, China.
出处 《电网技术》 EI CSCD 北大核心 2004年第12期5-8,29,共5页 Power System Technology
基金 国家自然科学基金资助项目(50177017) 高等学校优秀青年教师教学科研奖励计划资助项目
关键词 架空线路 控制算法 优先级权系数法 判断矩阵分析法 输电线路 Algorithms Cables Electric power systems Optimization Strategic planning
  • 相关文献

参考文献1

  • 1[6]Nguyen T T, Chan H Y. Evaluation of modal transformation matrices for overhead transmission lines and underground cables by optimization method[J]. IEEE Transactions on Power Delivery, 2002, 17(1):200-209.

同被引文献61

  • 1娄素华,余欣梅,熊信艮,吴耀武.电力系统机组启停优化问题的改进DPSO算法[J].中国电机工程学报,2005,25(8):30-35. 被引量:35
  • 2葛少云,闫大威,董智.基于模糊综合评判的城市电网电缆化改造[J].现代电力,2005,22(3):37-40. 被引量:8
  • 3王欣,秦斌,阳春华,吴敏.基于混沌遗传混合优化算法的短期负荷环境和经济调度[J].中国电机工程学报,2006,26(11):128-133. 被引量:40
  • 4陈玉林,陈允平,孙金莉.高压电缆金属护套交叉点行波折反射的规律[J].高电压技术,2006,32(10):11-14. 被引量:12
  • 5Nguyen T T,Chan H Y.Evaluation of model transformation matrices for overhead transmission lines and underground cables by optimization method[J].IEEE Transactions on Power Delivery,2002,17(1):200-209.
  • 6Yurdakul M.AHP as a strategic decision-making tool to justify machine tool selection[J].Journal of Materials Processing Technology,2004,146(3):365-376.
  • 7Satty T L.The Analytic Hierarchy Process[M].New York:McGraw-Hill,Inc,1980.
  • 8Chiclana F,Herrera F,Herrera-Viedma E.Integrating three representation models in fuzzy multipurpose decision making based on fuzzy preference relations[J].Fuzzy Sets and System,1998,97:33-48.
  • 9Nahman J M,Djordjevic V B,Salamon D D.Grounding effects of HV and MV underground cables associated with urban distribution substations[J].IEEE Transactions on Power Delivery,2002,17(1):111-116.
  • 10Bertini G J.Prioritizing reliability for underground distribution[J].IEEE Computer Application in Power,2002,15(1):29-34.

引证文献4

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部