大容量燃煤发电机组锅炉引风机配置分析 被引量:1

Allocation analysis of induced draft fans for coal-fired power plants with large capacity
在线阅读 下载PDF
导出
摘要 对某电厂超超临界1 000MW机组锅炉设置3台和2台引风机配置方案进行分析,按照低负荷时引风机高效率运行的原则,提出对于低负荷运行时间较长的机组采用每台机组配置3台引风机的设计方案,这样风机运行模式灵活,运行效率较高,增加的设备初投资10年即可回收。 On the basis of discussion on the allocation scheme of induced draft(ID)fans for an ultra supercritical 1 000MW unit,the ID fan types were selected for the configuration schemes with three and two ID fans.According to the principle that the ID fan runs with high efficiency under low load condition,the operation mode of the ID fan under low load condition was determined.Comparison and analysis on the above two allocation schemes were conducted,from technical economy aspect.For units with long-term operation under low load,it suggested that three ID fans should be allocated for each unit.In this design scheme,the ID fans had flexible operation mode and high efficiency,and the initial investment for new added equipments can be recovered within 10years.
出处 《热力发电》 CAS 北大核心 2013年第8期116-118,共3页 Thermal Power Generation
关键词 超超临界 1000 MW机组 引风机 配置方案 选型 ultra supercritical 1 000MW unit induced draft fan allocation type selection load
  • 相关文献

参考文献2

二级参考文献6

共引文献1

同被引文献1

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部