摘要
以600MW脱硫工程实例,介绍脱硫系统的工艺流程、DCS配置说明及DCS系统的应用及措施。
The technical process of FGD system, DCS configuration instruction and the application and measures of DCS system are briefly described with the case of 600MW FGD project.
出处
《自动化博览》
2007年第6期68-70,共3页
Automation Panorama1